03108-2018 |
|
04/20/2018 |
FPL (Moncada) - GPIF actual unit performance data schedules for 3/18. |
*03108-2018.pdf (0.7 MB)
|
03107-2018 |
|
04/20/2018 |
FPL (Moncada) - Schedules A1 through A9 and A12 for 3/18; and listed revised schedules. |
*03107-2018.pdf (1 MB)
|
03090-2018 |
|
04/20/2018 |
GPC (Badders) - Actual unit performance data schedules and actual unit outage data schedules for 3/18; retail cost recovery charges for Plant Crist, Plant Smith, Plant Scherer, and Plant Daniel. |
*03090-2018.pdf (0.3 MB)
|
03082-2018 |
|
04/20/2018 |
GPC (Alexander) - Schedules A1 through A9 and A12 for 3/18. |
*03082-2018.pdf (0.7 MB)
|
03068-2018 |
|
04/19/2018 |
Order PSC-2018-0188-CFO-EI granting TECO's request for confidential classification and motion for temporary protective order (of DN 00832-2018) for a period of 2 years from the date of this order. |
*03068-2018.pdf (0.3 MB) 03068-2018_2018-0188.ord.docx (0 MB)
|
03063-2018 |
|
04/19/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 5th set of interrogatories to FPL (Nos. 19-29). |
*03063-2018.pdf (0.1 MB)
|
03062-2018 |
|
04/19/2018 |
Duke Energy (Bernier) - Schedules A1 through A9 and A12 for 3/18. |
*03062-2018.pdf (0.6 MB)
|
03057-2018 |
|
04/19/2018 |
Duke Energy (Bernier) – Performance data report for 3/18. |
*03057-2018.pdf (0.2 MB)
|
03036-2018 |
|
04/18/2018 |
FPL (Moncada) - Notice of serving objections and responses to staff's 3rd set of interrogatories (Nos. 11-17). |
*03036-2018.pdf (0.2 MB)
|
03001-2018 |
|
04/17/2018 |
Duke Energy (Triplett) - Notice of service of objections to staff's 3rd set of interrogatories (No. 12). |
*03001-2018.pdf (0.1 MB)
|
02979-2018 |
|
04/16/2018 |
FPL (Butler) - Petition for mid-course corrections of capacity cost recovery and environmental cost recovery factors resulting from impacts of the Tax Cuts and Jobs Act of 2017. |
*02979-2018.pdf (2.4 MB)
|
02906-2018 |
|
04/12/2018 |
APA/Vedula - Note 4/12/18 to CLK/Holmes requesting DNs 05393-2014 and 04947-2014 be returned to sources. |
*02906-2018.pdf (0.1 MB)
|
02894-2018 |
|
04/11/2018 |
GPC (Badders) - Request for extended confidential classification [of portions of documents produced in connection with a review of 2015 fuel and purchased power transactions (Audit Control No. 16-020-1-1)] [DN 03027-2016 x-ref: 02584-2016]. |
*02894-2018.pdf (0.8 MB)
|
02893-2018 |
|
04/11/2018 |
GPC (Badders) - Request for extended confidential classification [of portions of documents produced in connection with a review of 2015 capacity expenditures (Audit Control No. 16-020-1-2)] [DN 03029-2016 x-ref: 02541-2016] |
*02893-2018.pdf (0.8 MB)
|
02862-2018 |
|
04/10/2018 |
CLK/Stauffer - Copy of letter dated 4/10/18 to FIPUG/Moyle forwarding index to record on appeal regarding FIPUG vs. Julie Imanuel Brown, etc., et al., Supreme Court Case No. SC18-226; advises record will be filed as reflected to the Supreme Court if no modifications are requested by 4/24/18. |
*02862-2018.pdf (0.3 MB)
|
02819-2018 |
|
04/09/2018 |
GCL/Brownless - Memo dated 4/6/18 to all parties of record and interested persons advising of informal meeting to be held 4/11/18, 1:30 p.m., Rm 105, Gunter Bldg, 2540 Shumard Oak Blvd, Tallahassee. |
*02819-2018.pdf (0.3 MB)
|
02708-2018 |
|
04/03/2018 |
APA/Deamer, Vedula - Copy of memo dated 3/29/18 to GCL/Brownless providing recommendation on confidential DNs 02463-2018 and 02092-2014; and attached memo with noted 3/29/18 response date providing recommendation on confidentiality of DNs 02463-2018 and 02092-2014(Audit Control No. 2014-027-4-3). [x-ref DNs 02092-2014 and 00527-2016] |
*02708-2018.pdf (0.4 MB)
|
02704-2018 |
|
04/03/2018 |
GPC (Griffin) - Redacted version of confidential DN 02703-2018. |
*02704-2018.pdf (1.5 MB)
|
02700-2018 |
|
04/03/2018 |
GPC (Badders) - (CONFIDENTIAL) A portion of the information in the hedging information report; specifically, pricing terms for natural gas hedging transactions between GPC and various counterparties. |
|
02699-2018 |
|
04/03/2018 |
GPC (Badders) - Request for confidential classification [of DN 02700-2018]; includes redacted version. |
*02699-2018.pdf (1.8 MB)
|
02698-2018 |
|
04/03/2018 |
TECO (Beasley) - (CONFIDENTIAL) Highlighted information on pages 12 and 14 of 2017 hedging activity true-up report. |
|
02697-2018 |
|
04/03/2018 |
TECO (Beasley) - Letter dated 4/3/18, forwarding confidential DN 02698-2018. |
*02697-2018.pdf (0.2 MB)
|
02696-2018 |
|
04/03/2018 |
TECO (Beasley) - Request for confidential classification [of DN 02698-2018]. |
*02696-2018.pdf (1 MB)
|
02694-2018 |
|
04/03/2018 |
Duke Energy (Bernier) - Direct testimony of James McClay and redacted Exh JM-1T. |
*02694-2018.pdf (3.5 MB)
|
02693-2018 |
|
04/03/2018 |
Duke Energy (Bernier) - Request for confidential classification [of DN 02692-2018]; includes redacted version. |
*02693-2018.pdf (7.3 MB)
|
02692-2018 |
|
04/03/2018 |
Duke Energy (Bernier) - (CONFIDENTIAL) Exh JM-1T to direct testimony of James McClay, Exh A. |
|
02691-2018 |
|
04/03/2018 |
Duke Energy (Bernier) - Letter dated 4/3/18, forwarding confidential DN 02692-2018. |
*02691-2018.pdf (0.3 MB)
|
02682-2018 |
|
04/03/2018 |
FPL (Moncada) - Testimony of Gerard J. Yupp and Exh GJY-2. |
*02682-2018.pdf (0.2 MB)
|
02679-2018 |
|
04/03/2018 |
TECO (Beasley) - Direct testimony of J. Brent Caldwell and [redacted] Exh JBC-1. |
*02679-2018.pdf (0.7 MB)
|
02663-2018 |
|
04/02/2018 |
GCL/Harper - Supplemental directions to Clerk of CLK [to include in the record on appeal DN 08043-2017, staff's prehearing statement, in addition to documents identified by FIPUG and FPL]. |
*02663-2018.pdf (0.2 MB)
|
02662-2018 |
|
04/02/2018 |
FPL (Moncada) - Directions to clerk [regarding record on appeal to be transmitted to Supreme Court, Case No. SC18-226]. |
*02662-2018.pdf (0.2 MB)
|
02617-2018 |
|
03/30/2018 |
CLK/Stauffer - Copy of letter dated 3/30/18 to atty Beasley returning confidential DN 05256-2014; with noted 3/30/18 receipt by C. Bonani. |
*02617-2018.pdf (0.2 MB)
|
02616-2018 |
|
03/30/2018 |
GPC (Badders) - Notice of serving responses to staff's 2nd set of interrogatories (No. 8). |
*02616-2018.pdf (0.1 MB)
|
02615-2018 |
|
03/30/2018 |
TECO (Beasley) - Notice of service of answers to [staff's] 2nd set of interrogatories (Nos. 13-16). |
*02615-2018.pdf (0.5 MB)
|
02584-2018 |
|
03/29/2018 |
Duke Energy (Bernier) - Notice of service of response to staff's 2nd set of interrogatories (Nos. 10-11). |
*02584-2018.pdf (0 MB)
|
02578-2018 |
|
03/28/2018 |
GCL/Brownless - Corrected certificate of service for staff's 3rd set of interrogatories to GPC (Nos. 9-10). |
*02578-2018.pdf (0.1 MB)
|
02576-2018 |
|
03/28/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 4th set of interrogatories to FPL (No. 18). |
*02576-2018.pdf (0.1 MB)
|
02575-2018 |
|
03/28/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 3rd set of interrogatories to GPC (Nos. 8-9). |
*02575-2018.pdf (0.1 MB)
|
02574-2018 |
|
03/28/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 3rd set of interrogatories to Duke Energy (No. 12). |
*02574-2018.pdf (0.1 MB)
|
02572-2018 |
|
03/28/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 3rd set of interrogatories to TECO (Nos. 17-20). |
*02572-2018.pdf (0.1 MB)
|
02569-2018 |
|
03/28/2018 |
FPUC (Keating) - Notice of service of responses to staff's 2nd set of interrogatories (Nos. 3-6), |
*02569-2018.pdf (0.1 MB)
|
02561-2018 |
|
03/28/2018 |
FPL (Moncada) - Notice of service of objections and responses to staff's 2nd set of interrogatories (Nos. 9-10). |
*02561-2018.pdf (0.2 MB)
|
02547-2018 |
|
03/27/2018 |
APA/Vedula - Note dated 3/27/18 to CLK/Holmes requesting DNs 05256-2014 and 05001-2014 be returned to source. |
*02547-2018.pdf (0.1 MB)
|
02541-2018 |
|
03/27/2018 |
Order PSC-2018-0164-PCO-EI first order modifying order establishing procedure; Order PSC-2018-0079-PCO-EI is reaffirmed in all other respects. |
*02541-2018.pdf (0.2 MB) 02541-2018_2018-0164.ord.docx (0 MB)
|
02536-2018 |
|
03/26/2018 |
TECO (Beasley) - GPIF actual unit performance data schedules for 2/18; and revisions for 2017 year end GPIF (Bayside 1 and 2 - October/November Mbtu's). |
*02536-2018.pdf (0.5 MB)
|
02534-2018 |
|
03/26/2018 |
TECO (Beasley) - Schedules A1 through A9 and A12 for 2/18. |
*02534-2018.pdf (0.6 MB)
|
02463-2018 |
|
03/21/2018 |
FPL (Moncada) - (CONFIDENTIAL) Materials provided pursuant to Audit No. 14-027-4-3; includes redacted version [x-ref: 02092-2014 and 00527-2016]. |
|
02462-2018 |
|
03/21/2018 |
FPL (Moncada) - Second request for extension of confidential classification of [DN 02463-2018] materials provided pursuant to Audit No. 14-027-4-3; includes redacted version [x-ref: 02092-2014 and 00527-2016]. |
*02462-2018.pdf (3.7 MB)
|
02461-2018 |
|
03/21/2018 |
FPL (Moncada) - (CONFIDENTIAL) Materials provided pursuant to Audit No. 16-020-4-2 [x-ref: 02786-2016 and 03189-2016]. |
|
02460-2018 |
|
03/21/2018 |
FPL (Moncada) - First request for extension of confidential classification of [DN 02461-2018] materials provided pursuant to Audit No. 16-020-4-2; includes redacted version [x-ref: 02786-2016 and 03189-2016] |
*02460-2018.pdf (2.2 MB)
|
02459-2018 |
|
03/21/2018 |
FPL (Moncada) - (CONFIDENTIAL) Materials provided pursuant to Audit No. 14-027-4-1 [x-ref: 02094-2014, 02095-2014, 02096-2014, and 00724-2016]. |
|
02458-2018 |
|
03/21/2018 |
FPL (Moncada) - Second request for extension of confidential classification of [DN 02459-2018] materials provided pursuant to Audit No. 14-027-4-1; includes redacted version [x-ref: 02094-2014, 02095-2014, 02096-2014, and 00724-2016]. |
*02458-2018.pdf (20.1 MB)
|
02447-2018 |
|
03/21/2018 |
FPUC (Young) - 2/18 fuel schedules for consolidated electric Florida divisions. |
*02447-2018.pdf (3.2 MB)
|
02444-2018 |
|
03/20/2018 |
AFD/Barrett - Memo with noted 3/19/18 response date providing recommendation on confidentiality of DN 02065-2018; and attached copy of memo dated 3/19/18 to GCL/Brownless providing recommendation on confidential DN 02065-2018. |
*02444-2018.pdf (0.4 MB)
|
02443-2018 |
|
03/20/2018 |
AFD/Barrett - Memo with noted 3/19/18 response date providing recommendation on confidentiality of DN 02058-2018; and attached copy of memo dated 3/19/18 to GCL/Brownless providing recommendation on confidential DN 02058-2018. |
*02443-2018.pdf (0.4 MB)
|
02442-2018 |
|
03/20/2018 |
AFD/Barrett - Memo with noted 3/19/18 response date providing recommendation on confidentiality of DN 02045-2018; and attached copy of memo dated 3/19/18 to GCL/Brownless providing recommendation on confidential DN 02045-2018. |
*02442-2018.pdf (0.4 MB)
|
02437-2018 |
|
03/20/2018 |
FPL (Moncada) - GPIF actual unit performance data schedules for 2/18. |
*02437-2018.pdf (0.7 MB)
|
02436-2018 |
|
03/20/2018 |
FPL (Moncada) - Schedules A1 through A9 and A12 for 2/18; and revised Schedules A1 and A1.1 for 12/17 and 1/18 |
*02436-2018.pdf (0.8 MB)
|
02435-2018 |
|
03/20/2018 |
Duke Energy (Bernier) – Performance data report for 2/18. |
*02435-2018.pdf (0.2 MB)
|
02423-2018 |
|
03/20/2018 |
GPC (Badders) - Schedules A1 through A9 and A12 for 2/18. |
*02423-2018.pdf (0.7 MB)
|
02422-2018 |
|
03/20/2018 |
GPC (Badders) - Actual unit performance data schedules and actual unit outage data schedules for 2/18; retail cost recovery charges for Plant Crist, Plant Smith, Plant Scherer, and Plant Daniel. |
*02422-2018.pdf (0.2 MB)
|
02419-2018 |
|
03/20/2018 |
Duke Energy (Bernier) - Schedules A1 through A9 and A12 for 2/18; and modification to Schedule A2 (page 2) for 1/18. |
*02419-2018.pdf (0.6 MB)
|
02416-2018 |
|
03/20/2018 |
Duke Energy (Bernier) - Notice of service of objections to staff's 2nd set of interrogatories (Nos. 10-11). |
*02416-2018.pdf (0.1 MB)
|
02445-2018 |
|
03/19/2018 |
AFD/Barrett - Memo with noted 3/19/18 response date providing recommendation on confidentiality of DN 02071-2018; and attached copy of memo dated 3/19/18 to GCL/Brownless providing recommendation on confidential DN 02071-2018. |
*02445-2018.pdf (0.4 MB)
|
02395-2018 |
|
03/19/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 3rd set of interrogatories to FPL (Nos. 11-17). |
*02395-2018.pdf (0.1 MB)
|
02356-2018 |
|
03/15/2018 |
AFD/Barrett - Memo with noted 3/15/18 response date providing recommendation on confidentiality of DN 02043-2018; and attached copy of memo dated 3/15/18 to GCL/Brownless providing recommendation on confidential DN 02043-2018. |
*02356-2018.pdf (0.4 MB)
|
02355-2018 |
|
03/15/2018 |
AFD/Barrett - Memo with noted 3/15/18 response date providing recommendation on confidentiality of DN 02063-2018; and attached copy of memo dated 3/15/18 to GCL/Brownless providing recommendation on confidential DN 02063-2018. |
*02355-2018.pdf (0.4 MB)
|
02354-2018 |
|
03/15/2018 |
AFD/Barrett - Memo with noted 3/15/18 response date providing recommendation on confidentiality of DN 02054-2018; and attached copy of memo dated 3/15/18 to GCL/Brownless providing recommendation on confidential DN 02054-2018. |
*02354-2018.pdf (0.4 MB)
|
02349-2018 |
|
03/15/2018 |
FPL (Butler) - Petition for approval of GPIF results for the period 1/17 through 12/17; testimony of Charles R. Rote and Exh CRR-1. |
*02349-2018.pdf (0.6 MB)
|
02344-2018 |
|
03/15/2018 |
GPC (Badders) - Direct testimony of C. L. Nicholson and Exh CLN-1. |
*02344-2018.pdf (0.9 MB)
|
02342-2018 |
|
03/15/2018 |
TECO (Beasley) - Petition for approval of generating performance incentive factor results for the 12-month period ending 12/17; direct testimony of Brian S. Buckley and Exhs BSB-1 and BSB-2. |
*02342-2018.pdf (10.4 MB)
|
02335-2018 |
|
03/15/2018 |
Duke Energy (Bernier) - Petition for approval of GPIF results for period ending 12/17; direct testimony of Matthew J. Jones and Exh MJJ-1T. |
*02335-2018.pdf (0.4 MB)
|
02332-2018 |
|
03/14/2018 |
AFD/Barrett - Memo with noted 3/14/18 response date providing recommendation on confidentiality of DN 01804-2018; and attached copy of memo dated 3/14/18 to GCL/Brownless providing recommendation on confidential DN 01804-2018. |
*02332-2018.pdf (0.4 MB)
|
02331-2018 |
|
03/14/2018 |
AFD/Barrett - Memo with noted 3/14/18 response date providing recommendation on confidentiality of DN 02031-2018; and attached copy of memo dated 3/14/18 to GCL/Brownless providing recommendation on confidential DN 02031-2018. |
*02331-2018.pdf (0.4 MB)
|
02292-2018 |
|
03/13/2018 |
AFD/Reecy - Memo dated 3/13/18 to CLK/Holmes, with attached listing of confidential documents in dockets closed during 1/18, identifying whether each document should be retained or returned to source. |
*02292-2018.pdf (0.8 MB)
|
02279-2018 |
|
03/13/2018 |
FIPUG (Moyle) - Directions to Clerk of FPSC and state of actions to be reviewed, as filed in Supreme Court, Case No. SC18-226 |
*02279-2018.pdf (0.1 MB)
|
02196-2018 |
|
03/09/2018 |
AFD/Barrett – Memo dated 3/9/18 to CLK/Stauffer requesting DNs 05882-2016, 02405-2016, 03191-2016, 06844-2016, 06893-2016, 07038-2016, 07226-2016, 07224-2016, 07867-2016, 01842-2016 be returned to source. |
*02196-2018.pdf (0.2 MB)
|
02114-2018 |
|
03/05/2018 |
Duke Energy (Bernier) - Request for confidential classification [of DN 02071-2018]; includes redacted version. |
*02114-2018.pdf (1.7 MB)
|
02113-2018 |
|
03/05/2018 |
Duke Energy (Bernier) - Notice of service of responses to staff's 1st set of interrogatories (Nos. 1-9) and staff's 1st request for PODs (No. 1). |
*02113-2018.pdf (0.1 MB)
|
02071-2018 |
|
03/05/2018 |
Duke Energy (Bernier) - (CONFIDENTIAL) Certain information contained in response to staff's 1st set of interrogatories (Nos. 1-9). |
|
02070-2018 |
|
03/05/2018 |
Duke Energy (Bernier) - Letter dated 3/5/18, forwarding confidential DN 02071-2018. |
*02070-2018.pdf (0.4 MB)
|
02065-2018 |
|
03/02/2018 |
FPL (Moncada) - (CONFIDENTIAL) Certain information provided in response to staff's 1st set of interrogatories (No. 1). |
|
02064-2018 |
|
03/02/2018 |
FPL (Moncada) - Request for confidential classification of [DN 02065-2018] information provided in response to staff's 1st set of interrogatories (No. 1); includes redacted version. |
*02064-2018.pdf (1.7 MB)
|
02063-2018 |
|
03/02/2018 |
FPL (Moncada) - (CONFIDENTIAL) Certain information provided in Exh RBD-2 to direct testimony of Renae B. Deaton and Exh GJY-1 to direct testimony of Gerard J. Yupp. |
|
02062-2018 |
|
03/02/2018 |
FPL (Moncada) - Request for confidential classification of [DN 02063-2018] certain portions of Exhs RBD-2 and GJY-1; includes redacted version. |
*02062-2018.pdf (1.5 MB)
|
02060-2018 |
|
03/02/2018 |
APA/Mailhot - Memo dated 3/2/18 to CLK/Holmes, with attached listing of confidential documents in dockets closed during 1/18, identifying whether each document should be retained or returned to source; 34 documents to be retained; no documents to be returned to source. |
*02060-2018.pdf (0.9 MB)
|
02059-2018 |
|
03/02/2018 |
TECO (Beasley) - Letter dated 3/2/18, forwarding confidential DN 02058-2018. |
*02059-2018.pdf (0.1 MB)
|
02058-2018 |
|
03/02/2018 |
TECO (Beasley) - (CONFIDENTIAL) Highlighted information contained in answers to staff's 1st set of interrogatories (Nos. 6, 8, and 9). |
|
02057-2018 |
|
03/02/2018 |
TECO (Beasley) - Request for confidential classification [of DN 02058-2018] and motion for temporary protective order. |
*02057-2018.pdf (1.1 MB)
|
02056-2018 |
|
03/02/2018 |
TECO (Beasley) - Notice of service of answers to 1st set of interrogatories (Nos. 1-12) and 1st request for PODs (No. 1) of staff. |
*02056-2018.pdf (0.5 MB)
|
02055-2018 |
|
03/02/2018 |
TECO (Beasley) - Request for confidential classification [of DN 02054-2018]. |
*02055-2018.pdf (0.7 MB)
|
02054-2018 |
|
03/02/2018 |
TECO (Beasley) - (CONFIDENTIAL) Certain highlighted information contained in Schedule A12, Page 1 of 1 (Bates stamp page 40) for 1/17 through 12/17. |
|
02053-2018 |
|
03/02/2018 |
TECO (Beasley) - Letter dated 3/2/18, forwarding confidential DN 02054-2018. |
*02053-2018.pdf (0.2 MB)
|
02045-2018 |
|
03/02/2018 |
GPC (Badders) - (CONFIDENTIAL) Certain information submitted in response to staff's 1st set of interrogatories (Nos. 1-7); specifically, Nos. 1, 2, 4, 5, and 7. [CLK note: Hardcopy is confidential version; CD consists of request for confidential classification]. |
|
02044-2018 |
|
03/02/2018 |
GPC (Badders) - Request for confidential classification [of DN 02045-2018]; includes redacted version [CLK note: Hardcopy is confidential version; CD consists of request for confidential classification]. |
*02044-2018.pdf (3.9 MB)
|
02043-2018 |
|
03/02/2018 |
GPC (Griffin) - (CONFIDENTIAL) Certain information contained in Schedule CCA-4 of Exh CSB-1 to direct testimony of C. Shane Boyett [DN 02033-2018]. [CLK note: Hardcopy is confidential version; CD consists of request for confidential classification]. |
|
02042-2018 |
|
03/02/2018 |
GPC (Griffin) - Request for confidential classification [of DN 02043-2018]; includes redacted version [CLK note: Hardcopy is confidential version; CD consists of request for confidential classification]. |
*02042-2018.pdf (1 MB)
|
02038-2018 |
|
03/02/2018 |
FPL (Moncada) - Petition for approval of solar base rate adjustment to be effective 2019; testimony of William F. Brannen and Exhs WFB-1 through WFB-6; testimony of Juan E. Enjamio and Exh JE-1 and Exh JE-6. |
*02038-2018.pdf (3.2 MB)
|
02037-2018 |
|
03/02/2018 |
FPL (Moncada) - Petition for approval of fuel cost recovery and capacity cost recovery net final true-ups for period ending 12/17; and 2017 mechanism results; testimony of Renae B. Deaton, Exh RBD-1 and redacted Exh RBD-2; testimony of Gerard J. Yupp and redacted Exh GJY-1. |
*02037-2018.pdf (0.7 MB)
|
02034-2018 |
|
03/02/2018 |
FPUC (Keating) - Petition for approval of fuel adjustment and purchased power cost recovery final true-up amount for period ended 12/17; direct testimony of Curis Young and Exh CDY-1. |
*02034-2018.pdf (0.2 MB)
|
02033-2018 |
|
03/02/2018 |
GPC (Badders) - Direct testimony of C. Shane Boyett and Exhs CSB-1 and CSB-2. |
*02033-2018.pdf (0.7 MB)
|
02031-2018 |
|
03/02/2018 |
Duke Energy (Bernier) - (CONFIDENTIAL) Certain information contained in direct testimony of Jeffrey Swartz and Exh JS-1; Exhs CAM-2T, Sheets 2 and 3 of 3, and Exh CAM-3T, Schedule A12, Sheet 9 of 9, to direct testimony of Christopher A. Menendez. |
|
02030-2018 |
|
03/02/2018 |
Duke Energy (Bernier) - Letter dated 3/2/18, forwarding confidential DN 02031-2018. |
*02030-2018.pdf (0.4 MB)
|
02029-2018 |
|
03/02/2018 |
Duke Energy (Bernier) - Request for confidential classification [of DN 02031-2018]; includes redacted version. |
*02029-2018.pdf (1.8 MB)
|
02028-2018 |
|
03/02/2018 |
Duke Energy (Bernier) - Petition for approval of fuel cost recovery and capacity cost recovery actual true-ups for period ending 12/17; direct testimony of Christopher A. Menendez, Exhs CAM-1T and CAM-4T, and redacted Exhs CAM-2T and CAM-3T; redacted direct testimony of Jeffrey Swartz and redacted Exh JS-1. |
*02028-2018.pdf (1.3 MB)
|
02027-2018 |
|
03/02/2018 |
GPC (Badders) - Notice of serving responses to staff's 1st set of interrogatories (Nos. 1-7). |
*02027-2018.pdf (0.1 MB)
|
02023-2018 |
|
03/02/2018 |
FPUC (Young) - 1/18 fuel schedules for consolidated electric Florida divisions. |
*02023-2018.pdf (3.2 MB)
|
02022-2018 |
|
03/02/2018 |
TECO (Beasley) - Petition for approval of fuel cost recovery and capacity cost recovery net true-ups for 12-month period ending 12/17; direct testimony of Penelope A. Rusk and Exh PAR-1. |
*02022-2018.pdf (0.9 MB)
|
01978-2018 |
|
02/28/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 2nd set of interrogatories to Duke Energy (Nos. 10-11). |
*01978-2018.pdf (0.1 MB)
|
01977-2018 |
|
02/28/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 2nd set of interrogatories to GPC (No. 8). |
*01977-2018.pdf (0.1 MB)
|
01941-2018 |
|
02/28/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 2nd set of interrogatories to TECO (Nos. 13-16). |
*01941-2018.pdf (0.1 MB)
|
01885-2018 |
|
02/27/2018 |
APA/Deamer - Memo dated 2/27/18 to CLK, with attached copy of letter to FPL advising that the Commission will conduct an audit (Audit Control No. 2018-058-4-1); formal report expected to be issued for internal Commission use on 9/7/18. |
*01885-2018.pdf (0.1 MB)
|
01884-2018 |
|
02/27/2018 |
APA/Deamer - Memo dated 2/27/18 to CLK, with attached copy of letter to TECO advising that the Commission will conduct an audit (Audit Control No. 2018-058-2-2); formal report expected to be issued for internal Commission use on 9/7/18. |
*01884-2018.pdf (0.1 MB)
|
01883-2018 |
|
02/27/2018 |
APA/Deamer - Memo dated 2/27/18 to CLK, with attached copy of letter to Duke Energy advising that the Commission will conduct an audit (Audit Control No. 2018-058-2-1); formal report expected to be issued for internal Commission use on 9/7/18. |
*01883-2018.pdf (0.1 MB)
|
01882-2018 |
|
02/27/2018 |
APA/Deamer - Memo dated 2/27/18 to CLK, with attached copy of letter to GPC advising that the Commission will conduct an audit (Audit Control No. 2018-058-1-1); formal report expected to be issued for internal Commission use on 9/7/18. |
*01882-2018.pdf (0.1 MB)
|
01857-2018 |
|
02/26/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 2nd set of interrogatories to FPUC (Nos. 3-6). |
*01857-2018.pdf (0.1 MB)
|
01856-2018 |
|
02/26/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 2nd set of interrogatories to FPL (Nos. 9-10). |
*01856-2018.pdf (0.1 MB)
|
01854-2018 |
|
02/26/2018 |
TECO (Beasley) - GPIF actual unit performance data schedules for 1/18. |
*01854-2018.pdf (0.5 MB)
|
01853-2018 |
|
02/26/2018 |
TECO (Beasley) - Schedules A1 through A9 and A12 for 1/18; and revised Schedule A4 for 10/17 through 12/17. |
*01853-2018.pdf (0.7 MB)
|
01849-2018 |
|
02/26/2018 |
Order PSC-2018-0105-PCO-EI approving FPL’s petition for mid-course correction effective with the 3/18 billing cycle; docket to remain open. |
*01849-2018.pdf (0.5 MB) 01849-2018_2018-0105.ord.docx (0.3 MB)
|
01840-2018 |
|
02/26/2018 |
FPUC (Young) - Letter dated 2/26/18 with attached revised 1/18 fuel schedules for consolidated electric Florida divisions. |
*01840-2018.pdf (3.2 MB)
|
01804-2018 |
|
02/23/2018 |
Duke Energy (Bernier) - (CONFIDENTIAL) Exh A to request for confidential classification [DN 01801-2018], Forms 423-2 and 423-2b, specifically, line 7, international marine terminal, for 1/17 through 3/17. |
|
01803-2018 |
|
02/23/2018 |
Duke Energy (Bernier) - Letter dated 2/23/18, forwarding confidential DN 01804-2018. |
*01803-2018.pdf (0.3 MB)
|
01801-2018 |
|
02/23/2018 |
Duke Energy (Bernier) - Letter dated 2/23/18, with attached updated forms 423-2 and 423-2b for 1/17 through 3/17 for international marine terminal; and request for confidential classification [of DN 01804-2018]. |
*01801-2018.pdf (0.9 MB)
|
01797-2018 |
|
02/23/2018 |
FPUC (Keating) - Notice of service of responses to staff's 1st set of interrogatories (Nos. 1-2). |
*01797-2018.pdf (0.1 MB)
|
01781-2018 |
|
02/22/2018 |
FPUC (Young) - Revised 1/18 fuel schedules for consolidated electric Florida divisions. |
*01781-2018.pdf (3.2 MB)
|
01686-2018 |
|
02/21/2018 |
FPUC (Young) - 1/18 fuel schedules for consolidated electric Florida divisions. |
*01686-2018.pdf (3.2 MB)
|
01639-2018 |
|
02/20/2018 |
FPL (Moncada) - GPIF Actual Unit Performance Data Schedules for 1/18. |
*01639-2018.pdf (0.5 MB)
|
01638-2018 |
|
02/20/2018 |
FPL (Moncada) - Schedules A1 through A9 and A12 for 1/18. |
*01638-2018.pdf (0.4 MB)
|
01588-2018 |
|
02/20/2018 |
Duke Energy (Bernier) – Performance data report for 1/18. |
*01588-2018.pdf (0.2 MB)
|
01551-2018 |
|
02/20/2018 |
Supreme Court of Florida [Supreme Court] (Tomasino) - Acknowledgment of new case, SC18-226, Citizens of the State of Florida vs. Julie Imanuel Brown, etc., et al. |
*01551-2018.pdf (0.2 MB)
|
01535-2018 |
|
02/19/2018 |
GPC (Alexander) – Revised Schedule A2 for 12/17 and Schedules A1-A9 and A12 for 1/18. |
*01535-2018.pdf (0.8 MB)
|
01531-2018 |
|
02/19/2018 |
GPC (Alexander) - Actual unit performance data schedules and actual unit outage data schedules for 1/18. |
*01531-2018.pdf (0.3 MB)
|
01530-2018 |
|
02/19/2018 |
Duke Energy (Bernier) - Schedules A1 through A9 and A12 for 1/18. |
*01530-2018.pdf (0.8 MB)
|
01512-2018 |
|
02/19/2018 |
AFD/Reecy - Memo dated 2/19/18 to CLK/Holmes, with attached listing of confidential documents in dockets closed during 1/18, identifying whether each document should be retained or returned to source; 41 documents to be retained; no documents to be returned to source. |
*01512-2018.pdf (0.8 MB)
|
01501-2018 |
|
02/19/2018 |
Duke Energy (Bernier) – Notice of service of objections to staff's 1st set of interrogatories (Nos. 1-9) and 1st request for PODS (No. 1) |
*01501-2018.pdf (0.1 MB)
|
01247-2018 |
|
02/15/2018 |
TRANSCRIPT - 2/6/18 Commission conference, Item 6 and 12. [CLK Note: Item 6 (2018001) and Item 12 (2018007) were combined and one transcript was produced. |
*01247-2018.pdf (0.1 MB)
|
01216-2018 |
|
02/14/2018 |
Order PSC-2018-0079-PCO-EI establishing procedure. |
*01216-2018.pdf (0.3 MB) 01216-2018_2018-0079.ord.docx (0.1 MB)
|
01187-2018 |
|
02/14/2018 |
Return receipt card indicating delivery of eight (8) confidential documents to Duke Energy/Triplett by U.S. Post Office on 2/9/18. |
*01187-2018.pdf (0.1 MB)
|
01186-2018 |
|
02/14/2018 |
Return receipt card indicating delivery of confidential DN 01113-2017 to atty Badders by U.S. Post Office. [CLK note: There is no delivery date indicated on card.] |
*01186-2018.pdf (0.1 MB)
|
01121-2018 |
|
02/12/2018 |
APA/Mailhot - Memo dated 2/12/18 to CLK/Holmes, with attached listing of confidential documents in dockets closed during 1/18, identifying whether each document should be retained or returned to source; 34 documents to be retained; no documents to be returned to source. |
*01121-2018.pdf (0.8 MB)
|
01040-2018 |
|
02/07/2018 |
AFD/Barrett Memo with noted 2/7/18 response date providing recommendation on confidentiality of DN 00832-2018; with attached copy of memo dated 2/7/18 to GCL/Brownless providing recommendation on confidential DN 00832-2018 |
*01040-2018.pdf (0.4 MB)
|
01039-2018 |
|
02/07/2018 |
AFD/Barrett Memo with noted 2/7/18 response date providing recommendation on confidentiality of DN 00738-2018; with attached copy of memo dated 2/7/18 to GCL/Brownless providing recommendation on confidential DN 00738-2018 |
*01039-2018.pdf (0.4 MB)
|
01038-2018 |
|
02/07/2018 |
AFD/Barrett Memo with noted 2/7/18 response date providing recommendation on confidentiality of DN 00824-2018; with attached copy of memo dated 2/7/18 to GCL/Brownless providing recommendation on confidential DN 00824-2018 |
*01038-2018.pdf (0.4 MB)
|
01037-2018 |
|
02/07/2018 |
AFD/Barrett Memo with noted 2/7/18 response date providing recommendation on confidentiality of DN 00705-2018; with attached copy of memo dated 2/7/18 to GCL/Brownless providing recommendation on confidential DN 00705-2018 |
*01037-2018.pdf (0.4 MB)
|
01036-2018 |
|
02/07/2018 |
TECO (Beasley) – Letter dated 2/7/18 with attached revisions [of DN 07280-2017] to direct testimony of witness Penelope A. Rusk’s and Exh PAR-3. |
*01036-2018.pdf (0.2 MB)
|
01024-2018 |
|
02/07/2018 |
CLK/Stauffer - Copy of letter dated 2/6/18 to atty Beasley returning confidential DN 01118-2017, 05514-2017, 05549-2017 and 05553-2017; with noted 2/7/18 receipt by Charles Bonani. |
*01024-2018.pdf (0.2 MB)
|
01019-2018 |
|
02/07/2018 |
CLK/Stauffer - Copy of letter dated 2/7/18 to Supreme Court/Tomasino forwarding a certified copy of a notice of administrative appeal and attached Order PSC-2018-0028-FOF-EI; advises appeal was filed on behalf of FIPUG. |
*01019-2018.pdf (0.8 MB)
|
01013-2018 |
|
02/06/2018 |
FIPUG (Moyle) - Notice of administrative appeal [of Order PSC-2018-0028-FOF-EI]. |
*01013-2018.pdf (0.3 MB)
|
00993-2018 |
|
02/06/2018 |
Vote sheet from 2/6/18 Commission conference, Item 6. |
*00993-2018.pdf (0.2 MB)
|
00980-2018 |
|
02/06/2018 |
CLK/Stauffer - Copy of letter dated 2/6/18 to atty Badders returning confidential DN 01113-2017. |
*00980-2018.pdf (0.1 MB)
|
00979-2018 |
|
02/06/2018 |
CLK/Stauffer - Copy of letter dated 2/6/18 to FPL/Butler returning confidential DN 01005-2017. |
*00979-2018.pdf (0.2 MB)
|
00978-2018 |
|
02/06/2018 |
CLK/Stauffer - Copy of letter dated 2/6/18 to Duke Energy/Triplett returning eight (8) listed confidential documents. |
*00978-2018.pdf (0.1 MB)
|
00971-2018 |
|
02/05/2018 |
TECO (Beasley) - Letter dated 2/5/18, with attached revised Schedule A-1 for 12/17, marked "revised 2/5/18;" advises this revised filing corrects a number that had an incorrect sign on it on the original filing. |
*00971-2018.pdf (0.3 MB)
|
00862-2018 |
|
01/31/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 1st set of interrogatories to Duke Energy (Nos. 1-9). |
*00862-2018.pdf (0.1 MB)
|
00861-2018 |
|
01/31/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 1st set of interrogatories to GPC (Nos. 1-7). |
*00861-2018.pdf (0.1 MB)
|
00860-2018 |
|
01/31/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 1st set of interrogatories to FPUC (Nos. 1-2). |
*00860-2018.pdf (0.1 MB)
|
00859-2018 |
|
01/31/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 1st set of interrogatories to FPL (Nos. 1-8). |
*00859-2018.pdf (0.1 MB)
|
00858-2018 |
|
01/31/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 1st set of interrogatories to TECO (Nos. 1-12). |
*00858-2018.pdf (0.1 MB)
|
00857-2018 |
|
01/31/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 1st request for PODs to TECO (No. 1). |
*00857-2018.pdf (0.1 MB)
|
00856-2018 |
|
01/31/2018 |
GCL/Brownless - Copy of certificate of service of staff’s 1st request for PODs to Duke Energy (No. 1). |
*00856-2018.pdf (0.1 MB)
|
00833-2018 |
|
01/31/2018 |
TECO (Beasley) - 423 forms for 9/17 through 11/17; includes redacted version of confidential DN 00832-2018. |
*00833-2018.pdf (4.1 MB)
|
00832-2018 |
|
01/31/2018 |
TECO (Beasley) - (CONFIDENTIAL) Forms 423-2, 2(a), and 2(b) for 9/17 through 11/17. |
|
00831-2018 |
|
01/31/2018 |
TECO (Beasley) - Letter dated 1/31/18 forwarding confidential DN 00832-2018. |
*00831-2018.pdf (0.2 MB)
|
00830-2018 |
|
01/31/2018 |
TECO (Beasley) - Request for specified confidential treatment [of DN 00832-2018] and motion for temporary protective order. |
*00830-2018.pdf (2 MB)
|
00828-2018 |
|
01/31/2018 |
Duke Energy (Triplett) - Forms 423 for 10/17 through 12/17; includes redacted version of confidential DN 00824-2018. |
*00828-2018.pdf (1.8 MB)
|
00824-2018 |
|
01/31/2018 |
Duke Energy (Triplett) - (CONFIDENTIAL) Forms 423 for 10/17 through 12/17. |
|
00821-2018 |
|
01/31/2018 |
Duke Energy (Triplett) - Request for confidential classification [of DN 00824-2018]. |
*00821-2018.pdf (2.4 MB)
|
00790-2018 |
|
01/30/2018 |
Duke Energy (Bernier) – Performance data report for 12/17. |
*00790-2018.pdf (0.3 MB)
|
00739-2018 |
|
01/29/2018 |
FPL (Butler) - Forms 423-1, 1(a), and 1(b) for 10/17 through 12/17; 423-2, 2(a), and 2(b) for SJRPP for 10/17 and 11/17; and 423-2, 2(a), and 2(b) for Plant Scherer for 9/17 through 11/17; includes redacted version of confidential DN 00738-2018. |
*00739-2018.pdf (2.6 MB)
|
00738-2018 |
|
01/29/2018 |
FPL (Butler) - (CONFIDENTIAL) Attachment A, Form 423-1(a) for 10/17 through 12/17; Forms 423-2, 2(a) and 2(b) for SJRPP for 10/17 and 11/17; and 423-2, 2(a), and 2(b) for Plant Scherer for 9/17 through 11/17. |
|
00737-2018 |
|
01/29/2018 |
FPL (Butler) - Request for confidential classification [of DN 00738-2018]; includes redacted version. |
*00737-2018.pdf (5.4 MB)
|
00707-2018 |
|
01/29/2018 |
AFD/Reecy - Memo dated 1/29/18 to CLK/Charles, with attached listing of confidential documents in dockets as of 1/11/18, identifying whether each document should be retained or returned to source. |
*00707-2018.pdf (1.6 MB)
|
00706-2018 |
|
01/29/2018 |
GPC (Badders) - Forms 423 fuel report for 10/17 through 12/17; includes redacted version of confidential DN 00705-2018. |
*00706-2018.pdf (4.1 MB)
|
00705-2018 |
|
01/29/2018 |
GPC (Badders) - (CONFIDENTIAL) Certain information submitted on Form 423 fuel reports for 10/17, 11/17, and 12/17; specifically, pricing for coal and related transportation services. |
|
00704-2018 |
|
01/29/2018 |
GPC (Badders) - Request for confidential classification [of DN 00705-2018]; includes redacted version. |
*00704-2018.pdf (4.6 MB)
|
00659-2018 |
|
01/25/2018 |
TECO (Beasley) - Schedules A1 through A9 and A12 for 12/17; and revised Schedule A4 for 11/17. |
*00659-2018.pdf (0.6 MB)
|
00658-2018 |
|
01/25/2018 |
TECO (Beasley) - GPIF actual unit performance data schedules for 12/17. |
*00658-2018.pdf (0.5 MB)
|
00641-2018 |
|
01/25/2018 |
RECOM for 2/6/18 Commission conference, Item 6, from AFD, ECO, ENG and GCL staff. |
*00641-2018.pdf (0.7 MB) 00641-2018_20180001.rcm.docx (0.3 MB)
|
00557-2018 |
|
01/22/2018 |
FPL (Butler) - Schedules A1 through A9 and A12 for 12/17; and revised Schedules A1, A1 YTD, A3, and A4 for 6/17 ,A1 YTD and A3 for 7/17 through 11/17. |
*00557-2018.pdf (1.4 MB)
|
00556-2018 |
|
01/22/2018 |
FPL (Butler) - GPIF actual unit performance data schedules for 12/17. |
*00556-2018.pdf (1.3 MB)
|
00554-2018 |
|
01/22/2018 |
GPC (Badders) - Schedules A1 through A9 and A12 for 12/17. |
*00554-2018.pdf (0.8 MB)
|
00526-2018 |
|
01/22/2018 |
APA/Deamer - Memo dated 1/19/18 to CLK, with attached copy of letter to FPL advising that the Commission will conduct an audit (Audit Control No. 2018-019-4-2); formal report expected to be issued for internal Commission use on 5/7/18. |
*00526-2018.pdf (0.5 MB)
|
00525-2018 |
|
01/22/2018 |
APA/Deamer - Memo dated 1/19/18 to CLK, with attached copy of letter to FPL advising that the Commission will conduct an audit (Audit Control No. 2018-019-4-1); formal report expected to be issued for internal Commission use on 5/7/18. |
*00525-2018.pdf (0.1 MB)
|
00524-2018 |
|
01/22/2018 |
APA/Deamer - Memo dated 1/19/18 to CLK, with attached copy of letter to TECO advising that the Commission will conduct an audit (Audit Control No. 2018-019-2-4); formal report expected to be issued for internal Commission use on 5/7/18. |
*00524-2018.pdf (0.4 MB)
|
00523-2018 |
|
01/22/2018 |
APA/Deamer - Memo dated 1/19/18 to CLK, with attached copy of letter to TECO advising that the Commission will conduct an audit (Audit Control No. 2018-019-2-3); formal report expected to be issued for internal Commission use on 5/7/18. |
*00523-2018.pdf (0.5 MB)
|
00512-2018 |
|
01/22/2018 |
APA/Deamer - Memo dated 1/19/18 to CLK, with attached copy of letter to Duke Energy advising that the Commission will conduct an audit (Audit Control No. 2018-019-2-2); formal report expected to be issued for internal Commission use on 5/7/18. |
*00512-2018.pdf (0.5 MB)
|
00511-2018 |
|
01/22/2018 |
APA/Deamer - Memo dated 1/19/18 to CLK, with attached copy of letter to Duke Energy advising that the Commission will conduct an audit (Audit Control No. 2018-019-2-1); formal report expected to be issued for internal Commission use on 5/7/18. |
*00511-2018.pdf (0.4 MB)
|
00510-2018 |
|
01/22/2018 |
APA/Deamer - Memo dated 1/19/18 to CLK, with attached copy of letter to FPUC advising that the Commission will conduct an audit (Audit Control No. 2018-019-1-3); formal report expected to be issued for internal Commission use on 5/7/18. |
*00510-2018.pdf (0.5 MB)
|
00509-2018 |
|
01/22/2018 |
APA/Deamer - Memo dated 1/19/18 to CLK, with attached copy of letter to GPC advising that the Commission will conduct an audit (Audit Control No. 2018-019-1-2); formal report expected to be issued for internal Commission use on 5/7/18. |
*00509-2018.pdf (0.1 MB)
|
00508-2018 |
|
01/22/2018 |
APA/Deamer - Memo dated 1/19/18 to CLK, with attached copy of letter to GPC advising that the Commission will conduct an audit (Audit Control No. 2018-019-1-1); formal report expected to be issued for internal Commission use on 5/7/18. |
*00508-2018.pdf (0.4 MB)
|
00447-2018 |
|
01/19/2018 |
GPC (Stone) - Actual unit performance data schedules and actual unit outage data schedules for 12/17; retail cost recovery charges for Plant Crist, Plant Smith, and Plant Daniel. |
*00447-2018.pdf (0.3 MB)
|
00425-2018 |
|
01/19/2018 |
Duke Energy (Bernier) - Schedules A1 through A9 and A12 for 12/17. |
*00425-2018.pdf (0.8 MB)
|
00337-2018 |
|
01/16/2018 |
FPL (Moncada) - Response to staff's first data request [Questions 1-13]. |
*00337-2018.pdf (1.5 MB)
|
00278-2018 |
|
01/12/2018 |
Florida Public Utilities Company [FPUC] (Keating) - Notice of intent to retain party status. |
*00278-2018.pdf (0.1 MB)
|
00180-2018 |
|
01/08/2018 |
Final Order PSC-2018-0028-FOF-EI approving expenditures and true-up amounts for fuel adjustment factors; GPIF targets, ranges, and rewards; and projected expenditures and true-up amounts for capacity cost recovery factor for FPL, FPUC, GPC, Duke Energy and TECO for the perioid 1/18-12/18; docket to remain open. |
*00180-2018.pdf (0.2 MB) 00180-2018_2018-0028.ord.docx (0.1 MB)
|
00166-2018 |
|
01/08/2018 |
GCL/Mapp - Note dated 1/5/18 to CLK/Charles, requesting that confidential DN 06421-2014 be returned to the utility. |
*00166-2018.pdf (0.1 MB)
|
00159-2018 |
|
01/08/2018 |
GCL/Brownless - Copy of letter dated 1/8/18 to FPL/Butler titled “staff's first data request;” information requested by 1/16/18. |
*00159-2018.pdf (0.1 MB)
|
00122-2018 |
|
01/05/2018 |
White Springs Agricultural Chemicals Inc. d/b/a PCS Phosphate - White Springs [White Springs] (Brew) - Notice reaffirming party status. |
*00122-2018.pdf (0 MB)
|
00110-2018 |
|
01/04/2018 |
Office of Public Counsel [OPC] (Kelly) - Notice of reaffirming party status. |
*00110-2018.pdf (0.6 MB)
|
00103-2018 |
|
01/04/2018 |
Gulf Power Company [GPC] (Badders) - Notice of intent to retain party status. |
*00103-2018.pdf (0.1 MB)
|
00066-2018 |
|
01/03/2018 |
Florida Power & Light Company (Butler) - Notice of intent to retain party status. |
*00066-2018.pdf (0.3 MB)
|
00064-2018 |
|
01/03/2018 |
Duke Energy Florida, LLC [Duke Energy] Bernier) - Notice of intent to retain party status. |
*00064-2018.pdf (0.2 MB)
|
00056-2018 |
|
01/03/2018 |
Florida Industrial Power Users Group [FIPUG] (Moyle) - Notice of intent to retain party status. |
*00056-2018.pdf (0.1 MB)
|
00053-2018 |
|
01/03/2018 |
Tampa Electric Company [TECO] (Beasley) - Notice of intent to retain party status. |
*00053-2018.pdf (0.2 MB)
|
00028-2018 |
|
01/02/2018 |
CORRESPONDENCE-Consumers & Representatives: CAO/McHargue - From Byron. |
*00028-2018.pdf (0.1 MB)
|
00001-2018 |
|
01/02/2018 |
Order PSC-2018-0001-PCO-EI establishing 2018 docket number. [CLK note: Docket 20170001 will be closed on issuance of this order.] |
*00001-2018.pdf (0.3 MB) 00001-2018_2018-0001.ord.docx (0 MB)
|