My Florida Florida Public Service Commission
Quick Search:   Advanced Search


Site Map
Interactive Site Map Close
Site Map | Site Index
Home Page > Clerk's Office > Dockets > PSC Docket Filings

PSC Docket Filings


NOTICE The information in this and related pages was automatically generated from the FPSC’s Case Management System. PDF documents, shown in Red and marked with an asterisk, are an image of the official records docket. Any supplementary document formats, such as word files, are provided for your convenience and may not accurately reflect the contents of the filed document. For more information, please contact the Office of Commission Clerk at clerk@psc.state.fl.us or (850) 413-6770.

To download viewer plug-ins: Adobe Acrobat PDF and Microsoft Office Product Viewers (Word, Excel, PowerPoint, etc.) For *.7z compressed files, see http://www.7-zip.org/
Note: The table below is now sortable. You can sort by document number, order number, filing date, or description. Click on the appropriate column heading to sort. Click again to sort the column in reverse order.
Document type All Official Filings Correspondence

Document Detail for Docket Number:20190131 21 documents
Document Order Date Filed Description Files
08229-2019
08/19/2019 CORRESPONDENCE-Parties & Interested Persons: CLK/Menasco - Confirmation to Gunster Law Firm/Keating that her contact information is in Dockets 20190131 and 20190135. *08229-2019.pdf (0.2 MB)
07092-2019
08/08/2019 Notice of rule development workshop to be held 8/20/19 at 9:30 a.m., Rm 148, Easley Bldg, 4075 Esplanade Way, Tallahassee [re proposed adoption of Rules 25-6.030, FAC, Storm Protection Plan; 25-6.031, Storm Protection Plan Cost Recovery Clause; proposed amendment or repeal of Rules 25-6.0143, FAC, Use of Accumulated Provision Accounts 228.1, 228.2, and 228.4; 25-6.034, Standard of Construction; 25-6.0341, Location of the Utility’s Electric Distribution Facilities; 25-6.0342, Electric Infrastructure Storm Hardening; 25-6.0343, Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements; 25-6.0345, Safety Standards for Construction of New Transmission and Distribution Facilities; 25-6.044, Continuity of Service; 25-6.0455, Annual Distribution Service Reliability Report; 25-6.061, Relocation of Poles; 25-6.064, Contribution-in-Aid-of-Construction for Installation of New or Upgraded Facilities; 25-6.077, Installation of Underground Distribution Systems within New Subdivisions; 25-6.078, Schedule of Charges, Installation of Underground Distribution Systems Within New Subdivisions; 25-6.081, Construction Practices; and 25-6.115, Facility Charges for Conversion of Existing Overhead Investor-owned Distribution Facilities]. *07092-2019.pdf (0.2 MB)
07092-2019_Comm. notice of August Workshop.docx (0.1 MB)
06846-2019
08/05/2019 FAR notice (to be published 8/6/19) of proposed rule development workshop to be held 8/20/19, 9:30 a.m., in Tallahassee; [re Rules 25-6.0143, Use of Accumulated Provision Accounts 228.1, 228.2, and 228.4; 25-6.030, Storm Protection Plan; 25-6.031, Storm Protection Plan Cost Recovery Clause; 25-6.034 Standard of Construction; 25-6.0341, Location of the Utility's Electric Distribution Facilities; 25-6.0342, Electric Infrastructure Storm Hardening; 25-6.0343, Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements; 25-6.0345, Safety Standards for Construction of New Transmission and Distribution Facilities; 25-6.044, Continuity of Service; 25-6.0455, Annual Distribution Service Reliability Report; 25-6.061, Relocation of Poles; 25-6.064, Contribution-in-Aid-of-Construction for Installation of New or Upgraded Facilities; 25-6.077, Installation of Underground Distribution Systems within New Subdivisions; 25-6.078, Schedule of Charges; 25-6.081, Construction Practices; 25-6.115, Facility Charges for Conversion of Existing Overhead Investor-owned Distribution Facilities]; with attached acknowledgment of submittal by Administrative Code and Register. *06846-2019.pdf (0.3 MB)
06846-2019_190131eu.doc (0 MB)
06791-2019
08/05/2019 CORRESPONDENCE-Parties & Interested Persons: CLK/Schultz - Confirmation to Miller that she has been added to the docket as an interested person. *06791-2019.pdf (0.1 MB)
05564-2019
07/16/2019 OPC (Rehwinkel) - Comments [preliminary, on draft proposed Rules 25-6.030 and 25-6.031, FAC]. *05564-2019.pdf (0.1 MB)
05563-2019
07/16/2019 FRF (Wright) - Post-workshop comments. [CLK note: This document does not include an official signature.] *05563-2019.pdf (0.1 MB)
05559-2019
07/16/2019 CORRESPONDENCE-Consumers & Representatives: Consumer comments from Cisarik; note from CLK/Hover forwarding comments to CAO. *05559-2019.pdf (0.1 MB)
05557-2019
07/15/2019 GPC (Badders) - Letter dated 7/15/19 to CLK/Teitzman, with attached post workshop comments. *05557-2019.pdf (0.1 MB)
05556-2019
07/15/2019 OPC (Kelly) - Comments [on draft proposed Rules 25-6.030 and 25-6.031]. [CLK note: This document does not include a signature.] *05556-2019.pdf (0.1 MB)
05553-2019
07/15/2019 TECO (Means) - Post workshop comments. *05553-2019.pdf (0.7 MB)
05552-2019
07/15/2019 FMEA (O'Hagan) - Post workshop comments. *05552-2019.pdf (0.2 MB)
05547-2019
07/15/2019 Duke Energy (Bernier) - Letter dated 7/15/19 to CLK/Teitzman, with attached post workshop comments. *05547-2019.pdf (0.9 MB)
05545-2019
07/15/2019 FPL (Rubin) - Post workshop comments. *05545-2019.pdf (0.2 MB)
05528-2019
07/15/2019 FECA (Hershel) - Post workshop comments. *05528-2019.pdf (0.3 MB)
05378-2019
07/08/2019 TRANSCRIPT - Pages 1 to 128 of 6/25/19 staff workshop on proposed adoption of Rules 25-6.030, 25-6.031, 25-6.0143, 25-6.034, 25-6.0341, 25-6.0342, 25-6.0343, 25-6.0345, 25-6.044, 25-6.0455, 25-6.061, 25-6.064, 25-6.077, 25-6.078, 25-6.081 and 25-6.115, FAC. *05378-2019.pdf (0.2 MB)
05196-2019
06/27/2019 CORRESPONDENCE-Parties & Interested Persons: CLK/Holmes - Confirmation to Pottle that Ausley/Beasley, Wahlen, and Means, and TECO/Brown have been added as interested persons. *05196-2019.pdf (0.1 MB)
05014-2019
06/19/2019 GCL/Harper - Memo dated 6/19/19 to CLK/Menasco, requesting that DNs 04845-2019 and 04754-2019 be moved from undocketed matters to Docketed 20190131. [Actions completed.] *05014-2019.pdf (0.1 MB)
04996-2019
06/18/2019 CORRESPONDENCE-Administrative: CLK/Wang - Confirmation to DET/Maco that docket ProgMods have been changed from A19 to A11a and B7a. *04996-2019.pdf (0.1 MB)
04982-2019
06/18/2019 GCL/King request to establish docket: Proposed adoption of Rule 25-6.030, FAC, Storm Protection Plan and Rule 25-6.031, FAC, Storm Protection Plan Cost Recovery Clause, and proposed amendment or repeal of Rule 25-6.0143, [FAC], Use of Accumulated Provision Accounts 228.1, 228.2, and 228.4; Rule 25-6.034, [FAC], Standard of Construction; Rule 25-6.0341, [FAC], Location of the Utility’s Electric Distribution Facilities; Rule 25-6.0342, [FAC], Electric Infrastructure Storm Hardening; Rule 25-6.0343, [FAC], Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements; Rule 25-6.0345, [FAC], Safety Standards for Construction of New Transmission and Distribution Facilities; Rule 25-6.044, [FAC], Continuity of Service; Rule 25-6.0455, [FAC], Annual Distribution Service Reliability Report; Rule 25-6.061, [FAC], Relocation of Poles; Rule 25-6.064, [FAC], Contribution-in-Aid-of-Construction for Installation of New or Upgraded Facilities; Rule 25-6.077, [FAC], Installation of Underground Distribution Systems within New Subdivisions; Rule 25-6.078, [FAC], Schedule of Charges, Installation of Underground Distribution Systems within New Subdivisions; Rule 25-6.081, [FAC], Construction Practices; and Rule 25-6.115, [FAC], Facility Charges for Conversion of Existing Overhead Investor-owned Distribution Facilities. *04982-2019.pdf (0.2 MB)
04845-2019
06/11/2019 Notice of development of rulemaking [to implement Section 366.96, FS, which was passed by the Florida Legislature in the 2019 session; to obtain comments on the proposed adoption of new Rules 25-6.030, FAC, Storm Protection Plan; 25-6.031, FAC, Storm Protection Cost Recovery Clause, and proposed amendment or repeal of Rules 25-6.0143, FAC, Use of Accumulated Provision Accounts 228.1, 228.2, and 228.4; 25-6.034, FAC, Standard of Construction; 25-6.0341, FAC, Location of the Utility’s Electric Distribution Facilities; 25-6.0342, FAC, Electric Infrastructure Storm Hardening; 25-6.0343, FAC, Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements; 25-6.0345, FAC, Safety Standards for Construction of New Transmission and Distribution Facilities; 25-6.044, FAC, Continuity of Service; 25-6.0455, FAC, Annual Distribution Service Reliability Report; 25-6.061, FAC, Relocation of Poles; 25-6.064, FAC, Contribution-in-Aid-of-Construction for Installation of New or Upgraded Facilities; 25-6.077, FAC, Installation of Underground Distribution Systems within New Subdivisions; 25-6.078, FAC, Schedule of Charges; 25-6.081, FAC, Construction Practices; 25-6.115, FAC, Facility Charges for Conversion of Existing Overhead Investor-owned Distribution Facilities]; with attached notice of development of rulemaking which appeared in 6/7/19 edition of FAR, a staff development workshop to be held 6/25/19 at 9:30 a.m., Rm 148, Betty Easley Conference Center, 4075 Esplanade Way, Tallahassee. [CLK note: This document moved from undocketed matters to Docket 20190131 per DN 05014-2019.] *04845-2019.pdf (0.3 MB)
04845-2019_Comm. notice of dev. of rulemaking2.docx (0.3 MB)
04754-2019
06/06/2019 FAR notice (to be published 6/7/19) of proposed rulemaking [to implement Section 366.96, FS, passed by the Florida Legislature in the 2019 session]; rule development workshop to be held 6/25/19, 9:30 a.m., in Tallahassee; with attached acknowledgment of submittal by Administrative Code and Register. [CLK note: This document moved from undocketed matters to Docket 20190131 per DN 05014-2019.] *04754-2019.pdf (0.3 MB)
04754-2019_rule.doc (0 MB)